EPA Savannah River Basin Watershed Project | |||
| Priority Recommendation | Summary | Addressed in Action Plan | ||
|---|---|---|---|---|
| #7 | Improve process to compile water use information, project water demand, and manage available supply. Balance reservoir flows and surface demands to assure adequate flows to meet demand | 1 | ||
| #10 | Implement a flow regime to support healthy wetland fishery resources. | 2 | ||
| #11 | A basin wide planning study, coordinated by the U.S. Army Corps of Engineers, should be funded and conducted, with full participation by all relevant stakeholders, to address overall water resources management in the basin. | 1 | ||
| #12 | Consequences of proposed modifications to or changes in operation of hydroelectric facilities should be evaluated both economically and operationally. | 1 | ||
| #15-1 | Identify suitable flow regimes for critical area - Augusta Shoals, wetlands. | 2 | ||
| #15-2 | Determine impacts of cut-off bends and how to manage and restore them. | 3 | ||
| #16 | Update the potential flood damage assessment for the basin and inform local governments such that appropriate information can be considered in their planning process. | 1 | ||
| #23 | Develop a single, universally accepted hydrologic data set for the basin. | 1 | ||
| #24 | Develop a single, universally accepted mechanism (model) for balancing water resource uses within each resource category (i.e., assimilative capacity, allocation, etc.). | 1 | ||
| #26-3 | Assess long-term impacts due to water regime alteration (habitat). | 2 | ||