Workers prepare site for dissolved oxygen system
A backhoe removes trees and debris from one of two sites that will house the dissolved oxygen system on the Savannah River.

Download Image: Full Size (0.14 MB)
Photo by: Jeremy Buddemeier |  VIRIN: 160302-A-FJ127-001.JPG