USACE drill team conducts soil sampling at Hunter Army Airfield for future construction projects
The U.S. Army Corps of Engineers, Savannah District’s geotechnical drill team began standard penetration tests at Hunter Army Airfield to obtain soil samples, March 13, 2025. The soil samples will provide critical data for future construction projects on the installation.

Download Image: Full Size (5.53 MB)
Photo by: Michael Ariola |  VIRIN: 250313-A-YC428-001.JPG