Results:
Tag: SavannahCorps
Clear
  • Upper Savannah reservoirs enter Drought Level 1

    SAVANNAH, Ga. –The three reservoirs on the Savannah River operated by the U.S. Army Corps of Engineers declared the first drought level Tuesday in response to the pool elevation at J. Strom Thurmond Lake dipping below 326.0 feet above mean sea level (ft-msl). Entering Trigger Level 1 activates the Corps’ drought management plan which conserves water in the reservoirs by reducing the outflows from the Thurmond Dam.
  • Army Corps of Engineers waives fees on National Public Lands Day, Sept. 28

    WASHINGTON, D.C. – The U.S. Army Corps of Engineers (USACE) announced today that it will waive day use fees normally charged at boat launch ramps and swimming beaches at its recreation areas nationwide in recognition of National Public Lands Day on Saturday, Sept. 28.
  • Weir simulation reaches targeted depth in Augusta

    SAVANNAH, Ga. – The Savannah River level in the Augusta area reached target elevation today as part of the simulation planned to allow the U.S. Army Corps of Engineers Savannah District as well as the public to observe the summer conditions expected with the fish passage recommended plan, known as Alternative 2-6d. The recommended plan involves construction of a rock weir which would take the place of the New Savannah Bluff Lock and Dam in order to maintain a pool in Augusta.
  • Updated biological opinion has positive impact on Savannah Harbor deepening

    SAVANNAH, Ga. – Two changes to the biological opinion associated with the Savannah Harbor Expansion Project give the Army Corps of Engineers more flexibility in contracting and scheduling construction activities as workers continue with the massive deepening project.
  • Thurmond Lake Project to mark some boundary lines over next few months

    SAVANNAH, Ga. – The Army Corps of Engineers will clear and remark the government boundary lines along portions of the J. Strom Thurmond Lake beginning Nov. 1 with the work continuing through the winter. Contracted crews will primarily work on the boundary in McCormick County, South Carolina.
  • Sterile grass-eating carp to be released into Thurmond Lake to control hydrilla

    SAVANNAH, Ga. – The U.S. Army Corps of Engineers will begin stocking sterile triploid grass carp to reduce the abundance of hydrilla in the J. Strom Thurmond Lake Oct. 25 and will run through Nov. 15. The fish form a part of management strategies identified in the April 2016 Avian Vacuolar Myelinopathy (AVM) Plan for the J. Strom Thurmond Project.