Drying material in DMCA 12A
Material in DMCA 12A dries as part of the ongoing maintenance dredging operations and channel deepening operations associated with the Savannah Harbor Expansion Project. The U.S. Army Corps of Engineers Savannah District mission is to keep the harbor at authorized depth and deepen the shipping channel for SHEP. USACE photo by Jonathan Bell

Download Image: Full Size (0.26 MB)
Photo by: Jonathan Bell |  VIRIN: 190320-A-ZV819-0004.JPG